In Trench 1 things are still steadily
progressing, tomorrow we hope to tackle the interior of the flanker and remove
the current upper layer of brick rubble. It is foreseeable that there will be a
large amount of material to remove, so a hard day of work ahead. In preparation
for this, the spoil heap and stone pile next to the trench has been moved about
six feet further to the southeast and away from the edge of the trench. While
this may seem like unnecessary extra work, it was unfortunately necessary, both
for health and safety reasons as the ever growing pile of rubble and soil was
slowly beginning to tower over the edge of the trench and cause issues with
access. Also, the flanker wall is slightly larger than expected and the extra
space we gain by moving the spoil heap means we can expose the flanker fully,
making it worth the extra effort.
More of the lead pipe running
into the stone box has been uncovered and seems fairly intact, we can only
follow its course as far as the trench edges allow but the surrounding
associated layers and features have left us with a complex puzzle which we hope
to piece together by the end of the week.
In Trench 2, Stuart was continuing the excavation and recording of his drainage feature. He removed the slate capping and sampled the soil fill. Hopefully this sample will yield some environmental evidence or artefact material that will help us to date this feature.
A third trench, Trench 3, has been opened over
an anomaly which was identified in the geophysical survey as a possible wall
with entrance-way. This may be a
continuation of the bawn wall leading from the flanker in Trench 1. Locating
the entrance-way to the bawn is important as it will hopefully inform us further
of the nature, size and exact location of the bawn in relation to the remaining
flanker and surrounding landscape. So far, excavation of this trench is
revealing a high concentration of large angular stones, most likely rubble from
a collapsed wall. We are hoping that beneath this layer, solid wall foundations
will emerge. Tree roots continue to be a nuisance across the site by making
digging difficult.
Here’s hoping tomorrow’s weather
is just as good too! Thanks to all our great volunteers today, Li, Gregory, Margaret,
Linda, Maureen and Pat. Many thanks also to George, Brendan and the rest of the
Prehen Historical and Environmental Society for all their ongoing interest and
provision of useful maps and information as the excavation has progressed.
Trench 1, planning and excavation in progress |
Volunteers Linda and Li working hard in Trench 3 |
Finds from trench 3 today, from the topsoil, lots of pot sherds, glass and metal |
The drain feature in Trench 2 following its excavation |
No comments:
Post a Comment